abr 282015
 

bypass_stejasaSTEJASA has been awarded the supply of two bypass systems downstream two Westinghouse W501D5 gas turbines. The scope of supply will include:
· GT diffuser
· Primary silencer
· A hydraulically operated diverter damper (5.100 x 5.100 mm)
· A maintenance guillotine
· A secondary silencer
· Bypass stack (40m above ground level)
· Steel structure
· AWL, ladders, platforms, etc…
The project required extremely severe sound pressure levels. This is why STEJASA will supply two silencers (primary and secondary) as well an acoustic wall. The delivery is expected by the end of 2015.