may 042015
 

bypass_system_stejasaSTEJASA has been awarded the supply of three bypass systems downstream three Siemens SGT6-5000F gas turbines and one GE FRAME 6F. The scope of supply will include:
· GT diffuser
· Hydraulically operated diverter dampers: three units 6.500 x 6.500 and one unit 4.200 x 4.200mm
· A maintenance guillotine
· A silencer
· Bypass stack (40m above ground level)
· Steel structure
· AWL, ladders, platforms, etc…
The delivery is expected by the end of 2015.